Panama Chitré Los Santos Santa-Ana y Playa El Rompio

Construction page 8
Page
1
M in 3 D
First water traitement bloc
Beginning the balcony
The guard on the roof
The balcony villa M
 
gypsum on the celing
 
bedroom
back bedroom villa M
finishing a bedroom villa M
bedroom size
Shower
Balcony view from the roof
laying the tiles
laying the tiles
Room Villa B
Stairs
Living room Villa M
Garage roof
Entrance roof of villa B
Detail of red tiles
finishing touches before painting the walls.

Outside details
 
optional sidewalk
 
 
The sidewalk as an option
 
Slide door
Painting the outside walls
Doors and windows
Jardines Del Rompio by night