Construction
page
7
Page
1 Page
2 page 3 Page
4 Page
5 Page
6 Page
8
and
villa M in 3 D
|
|
|
|
electricity
and water |
|
|
|
Second
floor taking shape |
Ocean
view from villa 16 |
|
|
|
|
We
begin with the new materiel: M2, (Émé doué
in Italian or Émé dos in Spanish).
|
|
|
|
|
|
|
|
|
|
|
Here
is the M2 assembled
|
|
|
|
|
Here
is the M2 with the first cement coating, before applying the
finishing coat
|
|
|
|
|
The
villas take shape
|
|
|
|
|
Roofs
can be used as a look out on the 3rd floor,using a ladder
|
|