Panama
Chitré
Los Santos
Santa-Ana
y
Playa El Rompio
THE CAPITAL
Condos El Rompio
The Advantages
Français
Construction
page 6
Page 1
Page 2
page 3
page 4
.
page 5
page7
and villa M in
3 D
Pouring cement for water tank
Preparing the 2nd storey
Preparing the 2nd storey
Our beach
Beach, fisherman, and a few tourists
The end of the structure and getting ready to pour the cement
Cement pouring
With the cement hose
Leveling
Finishing
one side finished
the 4 villas are ready for the second floor
Preparing second floor
Pouring the stairs
Stairs finished
Arch interior M
Arch interior M
Entrance M
beginning window detail
from the patio B
Kitchen