Panama Chitré Los Santos Santa-Ana y Playa El Rompio

Construction page 6 Page 1 Page 2 page 3 page 4 . page 5 page7 and villa M in 3 D

Pouring cement for water tank
Preparing the 2nd storey
Preparing the 2nd storey
Our beach
Beach, fisherman, and a few tourists
The end of the structure and getting ready to pour the cement
Cement pouring
With the cement hose
Leveling
Finishing
one side finished
the 4 villas are ready for the second floor
Preparing second floor
Pouring the stairs
Stairs finished
Arch interior M
Arch interior M
Entrance M
beginning window detail
from the patio B
Kitchen